Applications | Metal Stamping Parts |
---|---|
Packaging Details | film |
Delivery Time | 50 days |
Payment Terms | L/C,T/T |
Supply Ability | 5 sets/month |
Applications | Titanium Alloys |
---|---|
Conveyor Speed | 2-8m/min |
Spray Pressur | 190bar |
Power Supply | 380±10%/50HZ |
Vacuum | 0.1mbar |
Applications | Aluminum Alloy Motor Casings |
---|---|
Conveyor Speed | 1-5m/min |
Cleaning Pressure | 0.6Mpa |
Power Supply | 380±10%/50HZ |
Rinsing Pressure | 0.3Mpa |
Applications | Auto Parts |
---|---|
PLC | Mitsubishi Of Japan |
Height Of Conveying | 1000±50mm |
Power Supply | 380±10%/50HZ |
Inner Tank size | L815×W820×H1550mm |
Applications | Die-cast Parts |
---|---|
Vacuum Drying Chamber | 0.08mbar |
Equipment Capacity | 400-600 Parts/hour |
Power Supply | 380±10%/50HZ |
Ultrasonic Frequency | 28-40 KHZ |
Shockers | 432 Pcs |
---|---|
processing Temperature ℃ | 70-80 |
Part Size | 160*3800*1800MM |
Cleaning Time | 2-3min |
Packaging Details | film |
Applications | Tempered Glass |
---|---|
Total Ultrasonic Power | 7.5 KW |
Equipment Capacity | 3-5 Minutes / Basket |
Power Supply | 380±10%/50HZ |
Heating Temperature | 60℃ |
Applications | Glass Plates |
---|---|
Tank | 11 |
Equipment Capacity | 300-500 Plates/hour |
Power Supply | 380±10%/50HZ |
Ultrasonic Frequency | 28-40 KHZ |
Applications | Degreasing |
---|---|
Tank | 4 Tanks |
Compressed Air Supply Requirements | 5kg Pressure 10L/min |
Power Supply | 380±10%/50HZ |
Ultrasonic Frequency | 28-40 KHZ |
Applications | Precision Engineering Industries |
---|---|
Tank | 5 Tanks |
Compressed Air Supply Requirements | 5kg Pressure 10L/min |
Power Supply | 380±10%/50HZ |
Ultrasonic Frequency | 28-40 KHZ |