Automated Powder Coating Line with Quick Color Change for Decorative Items
Automated Powder Coating Line Overview:
If you deal with decorative items, our Automated Powder Coating Line with quick color change feature is a game - changer. It can switch colors in a matter of minutes, thanks to its advanced powder management system. The line is structured with multiple powder supply units for easy color swapping. It's perfect for coating decorative metal or plastic items, allowing for a wide variety of color options to meet market demands.
Partial parameter description of Automated Powder Coating Line
Features of the quick color change system:
The quick color change system is a new and economical quick color change system. It takes about 20 minutes to clean the spray booth and complete the color change.
The spray booth system consists of the following parts:
1. Sandwich structure of engineering plastic spray chamber: The spray chamber adopts 120mm sandwich PP engineering plastic plate structure,
2. With self-cleaning function, high separation efficiency of the large cyclone + rear filter secondary recovery system,
Powder bucket powder supply system of cleaning system: negative pressure is completed by connecting with the large cyclone pipe to save powder;
Unique bottom automatic flip structure: ensure uniform and clean negative pressure at the bottom
The bottom of the spray chamber is equipped with automatic cleaning air knife, no residual powder;
The large cyclone hopper adopts integrated powder pump and is easy to clean;
The powder supply center adopts a touch screen digital display control system
Process flow of Automated Powder Coating Line:
Loading⇒ Spray pre-degreasing and residue removal⇒main degreasing by swimming + ultrasonic + heating cleaning ⇒ Spray water washing (I) ⇒ Spray water washing (II) ⇒ Activation by swimming ⇒ spray washing (3) ⇒ spray washing (4), swim lay type passivation, spray washing (5) ⇒ spray washing (6) ⇒ pure water cleaning + adjustable automatic blow water, drop of water, dehydration drying furnace, natural cooling, online roast ⇒ under a belt anti-pull installation baked ⇒ on a PP board make automatic coating powder spraying cabinet⇒ hurricane recovery Powder supply center ⇒ Secondary recovery system ⇒ Grinding cabinet ⇒ Curing oven drying ⇒ Natural cooling⇒ QC inspection ⇒ Unloading ⇒ Packaging
Time of each pretreatment process of Automated Powder Coating Line:
project |
Spray pre-oil removal |
Swimming type main oil removal |
Spray washing 1 |
Spray washing 2 |
time |
1.5min |
4-5min |
1.5min |
1.5min |
project |
The swimming style main activated |
Spray washing 3 |
Spray washing 4 |
Swimming type passivation |
time |
4-5min |
1.5min |
1.5min |
4-5min |
project |
Spray washing 5 |
Spray washing 6 |
Pure water wash |
|
time |
1.5min |
1.5min |
1.5min |
|
Our typical customers:
The production line process scheme is determined to take into account the advanced technology and fully meet the quality requirements of products;