Superior Efficiency Automated Powder Coating Line for Automotive Parts
Automated Powder Coating Line Overview:
Our Automated Powder Coating Line offers unrivaled efficiency for automotive parts. With an advanced conveyor system, it can quickly move parts through pretreatment, powder application, and curing stages. The electrostatic spray guns ensure precise and fast powder deposition, reducing production time significantly. This line is structured with modular components for easy maintenance and expansion. Ideal for coating car body parts, wheels, etc., it boosts productivity in the automotive industry.
Partial parameter description of Automated Powder Coating Line
Suspended conveyor system:
Length:460m
Type: 5T heavy chain, pitch 150mm
Operation mode: continuous, counterweight tension
Single load-bearing point is less than or equal to 35KG
Break strength: 7400kg.Sq.cm
Process speed: 3m/min
Operation speed: 0-6m/min adjustable
Main material:
Ø Track: (including elbow, lifting) 65*75*3.0mm*460m
Flange plates: 400 sets
Adjustment seat: Ø4000*2 sets
Stretchable track: 90*90*4.0mm *20 pieces
Hanging bracket: made of 50*100*T2mm square tube
ØPaint and accessories: 1 type
Process flow of Automated Powder Coating Line:
Loading⇒ Spray pre-degreasing and residue removal⇒main degreasing by swimming + ultrasonic + heating cleaning ⇒ Spray water washing (I) ⇒ Spray water washing (II) ⇒ Activation by swimming ⇒ spray washing (3) ⇒ spray washing (4), swim lay type passivation, spray washing (5) ⇒ spray washing (6) ⇒ pure water cleaning + adjustable automatic blow water, drop of water, dehydration drying furnace, natural cooling, online roast ⇒ under a belt anti-pull installation baked ⇒ on a PP board make automatic coating powder spraying cabinet⇒ hurricane recovery Powder supply center ⇒ Secondary recovery system ⇒ Grinding cabinet ⇒ Curing oven drying ⇒ Natural cooling⇒ QC inspection ⇒ Unloading ⇒ Packaging
Time of each pretreatment process of Automated Powder Coating Line:
project |
Spray pre-oil removal |
Swimming type main oil removal |
Spray washing 1 |
Spray washing 2 |
time |
1.5min |
4-5min |
1.5min |
1.5min |
project |
The swimming style main activated |
Spray washing 3 |
Spray washing 4 |
Swimming type passivation |
time |
4-5min |
1.5min |
1.5min |
4-5min |
project |
Spray washing 5 |
Spray washing 6 |
Pure water wash |
|
time |
1.5min |
1.5min |
1.5min |
|
Our typical customers:
First of all, I would like to congratulate your company for its prosperous business and increasing orders every day. Here, our company is willing to provide technical support and service to your company at any time with perfect and detailed pre-sale and after-sales service and years of senior engineering and technical team. I wish our cooperation is pleasant!