Automated Powder Coating Line with Remote Monitoring for Easy Operation
Automated Powder Coating Line Overview:
Our Automated Powder Coating Line with remote monitoring is convenient for users. It has a built - in monitoring system that allows operators to check the line's performance from anywhere via a mobile device or computer. The line's structure is modular, making it easy to install and maintain. This feature is especially useful for companies with multiple production sites or for those who want to optimize their production process remotely. It can be used for coating a wide range of products, from metal tanks to plastic components.
Partial parameter description of Automated Powder Coating Line
Powder supply center
Size: L1200*D650*H2050
main unit :
Vibration table powder supply device
Powder automatic recovery system
Spray gun and pneumatic cleaning system of recovery pipeline
speed reducer
The powder supply center is specially designed for rapid color change, replacing the traditional powder supply bucket.
External integrated powder pump group, cleaning is more convenient;
The powder is poured into the fluidized powder tank and can be sucked away by the integrated powder pump group to provide the use of the spray gun.
The powder supply center is equipped with an efficient vibrating screen (screen 60 mesh). The recovered powder is screened by the vibrating screen, and the dirt or large particles caused by cleaning are separated, and the clean powder is collected into the powder supply center.
The powder supply center is an integrated part of the quick color change system and affects the spray quality of the final product. It is usually used as the core part of the automated production.
Process flow of Automated Powder Coating Line:
Loading⇒ Spray pre-degreasing and residue removal⇒main degreasing by swimming + ultrasonic + heating cleaning ⇒ Spray water washing (I) ⇒ Spray water washing (II) ⇒ Activation by swimming ⇒ spray washing (3) ⇒ spray washing (4), swim lay type passivation, spray washing (5) ⇒ spray washing (6) ⇒ pure water cleaning + adjustable automatic blow water, drop of water, dehydration drying furnace, natural cooling, online roast ⇒ under a belt anti-pull installation baked ⇒ on a PP board make automatic coating powder spraying cabinet⇒ hurricane recovery Powder supply center ⇒ Secondary recovery system ⇒ Grinding cabinet ⇒ Curing oven drying ⇒ Natural cooling⇒ QC inspection ⇒ Unloading ⇒ Packaging
Time of each pretreatment process of Automated Powder Coating Line:
project |
Spray pre-oil removal |
Swimming type main oil removal |
Spray washing 1 |
Spray washing 2 |
time |
1.5min |
4-5min |
1.5min |
1.5min |
project |
The swimming style main activated |
Spray washing 3 |
Spray washing 4 |
Swimming type passivation |
time |
4-5min |
1.5min |
1.5min |
4-5min |
project |
Spray washing 5 |
Spray washing 6 |
Pure water wash |
|
time |
1.5min |
1.5min |
1.5min |
|
Our typical customers:
On the basis of meeting all technical requirements of customer, reduce investment as far as possible, and reduce production energy consumption of the production line as far as possible, so as to reduce production cost;