Applications | Stainless Steel Tubes |
---|---|
Conveyor Speed | 3-10m/min |
Spray Pressur | 170bar |
Power Supply | 380±10%/50HZ |
Dryer Temperature | 75℃ |
Applications | Pre-treatment Before Powder Spraying |
---|---|
Conveyor Speed | 2-8m/min |
Spray Pressur | 80bar |
Power Supply | 380±10%/50HZ |
Dryer Temperature | 65℃ |
Equipment Use | Cleaning The Surface Of Precision Parts |
---|---|
Equipment Moved In | The Entrance Is At Least 2.6m Wide And 3m High |
Cycle Filtering | 50μ |
Working Temperature | 55-60℃ |
Wash Time | 5-10min |
Applications | Furniture Fittings |
---|---|
PLC | Mitsubishi Of Japan |
Spray Pressur | 130bar |
Power Supply | 380±10%/50HZ |
Dryer Temperature | 60-80℃ |
Applications | Stamping Factories |
---|---|
The Cleaning Medium | Hydrocarbon Solvents |
Work Rhythm | 5-7min / Basket |
Power Supply | 380±10%/50HZ |
Ultrasonic Frequency | 30-50 KHz |
Applications | Construction Hardware |
---|---|
PLC | Mitsubishi Of Japan |
Spray Pressur | 150bar |
Power Supply | 380±10%/50HZ |
Dryer | 70℃ |
Applications | Kettles |
---|---|
Conveyor Speed | 1-5m/min |
Spray Pressur | 120bar |
Power Supply | 380±10%/50HZ |
Dryer Temperature | 70℃ |
Applications | Castings |
---|---|
Total Ultrasonic Power | 7.5KW |
Equipment Capacity | 3-5 Minutes / Basket |
Power Supply | 380±10%/50HZ |
Heating Temperature | 75℃ |
Applications | Metal Sheets |
---|---|
Total Ultrasonic Power | 6KW |
Equipment Capacity | 3-5 Minutes / Basket |
Power Supply | 380±10%/50HZ |
Heating Temperature | 70℃ |
Applications | Tempered Glass |
---|---|
Total Ultrasonic Power | 7.5 KW |
Equipment Capacity | 3-5 Minutes / Basket |
Power Supply | 380±10%/50HZ |
Heating Temperature | 60℃ |