High - Precision Automated Powder Coating Line for Electronics Components
Automated Powder Coating Line Overview:
For electronics components, precision is key, and our Automated Powder Coating Line delivers. It has a sophisticated control system that regulates powder flow and spray gun movement accurately. Structurally, it has a cleanroom - like powder booth to prevent contamination. This line is a great fit for coating small and delicate electronics parts. The high - precision coating ensures the protection and functionality of these components.
Partial parameter description of Automated Powder Coating Line
Pre-treatment equipment
Spray pre oil removal *1 set: L4000mm *W1200mm *H1500mm (external dimensions)
Swimming type main oil remover *1 set: L8000mm *W1200mm *H1200mm (external dimensions)
Spray washing system *6 sets: L4000mm *W1200mm *H1500mm (external dimensions)
Spray pure water washing system *1 set: L4000mm *W1200mm *H1500mm (external dimensions)
Swimming type activation system *1 se:20,000 mm in length, 1,200 mm in width, and 1,500 mm in height (external dimensions)
Swimming type passivation *1 set: L10000m *W1200mm *H1200mm (external dimensions)
Drip device: L30000m * W1200mm * H200mm (external dimensions)
Automatic spray (pure water spray) L4000mm*W1200mm*H1800mm*8 sets
Process flow of Automated Powder Coating Line:
Loading⇒ Spray pre-degreasing and residue removal⇒main degreasing by swimming + ultrasonic + heating cleaning ⇒ Spray water washing (I) ⇒ Spray water washing (II) ⇒ Activation by swimming ⇒ spray washing (3) ⇒ spray washing (4), swim lay type passivation, spray washing (5) ⇒ spray washing (6) ⇒ pure water cleaning + adjustable automatic blow water, drop of water, dehydration drying furnace, natural cooling, online roast ⇒ under a belt anti-pull installation baked ⇒ on a PP board make automatic coating powder spraying cabinet⇒ hurricane recovery Powder supply center ⇒ Secondary recovery system ⇒ Grinding cabinet ⇒ Curing oven drying ⇒ Natural cooling⇒ QC inspection ⇒ Unloading ⇒ Packaging
Time of each pretreatment process of Automated Powder Coating Line:
project |
Spray pre-oil removal |
Swimming type main oil removal |
Spray washing 1 |
Spray washing 2 |
time |
1.5min |
4-5min |
1.5min |
1.5min |
project |
The swimming style main activated |
Spray washing 3 |
Spray washing 4 |
Swimming type passivation |
time |
4-5min |
1.5min |
1.5min |
4-5min |
project |
Spray washing 5 |
Spray washing 6 |
Pure water wash |
|
time |
1.5min |
1.5min |
1.5min |
|
Our typical customers:
To meet your company's technical requirements, our design also takes into account the diversity and comprehensiveness of the coating industry. The design integrates the technologies from several major domestic coating manufacturers, considering the variety of coating equipment and the economy of use. It aims to enhance various aspects of coating technology, including ease of maintenance and management: it adopts fully automated conveying and intelligent control, reduces human resources, increases turnover space, improves production efficiency, and minimizes damage to workpieces caused by human error.