| Applications | Metal Brackets |
|---|---|
| Conveyor Speed | 2-8m/min |
| Spray Pressur | 150bar |
| Power Supply | 380±10%/50HZ |
| Dryer Temperature | 60℃ |
| Applications | Metal Parts |
|---|---|
| Total Ultrasonic Power | 7.5 KW |
| Equipment Capacity | 3-5 Minutes / Basket |
| Power Supply | 380±10%/50HZ |
| Heating Temperature | 80℃ |
| Equipment Use | Cleaning The Surface Of Precision Parts |
|---|---|
| Equipment Moved In | The Entrance Is At Least 2.6m Wide And 3m High |
| Cycle Filtering | 50μ |
| Working Temperature | 55-60℃ |
| Wash Time | 5-10min |
| Workpiece Name | Construction Material |
|---|---|
| Conveyor Speed | 1~4m |
| Control | PLC |
| Maximum Part Weight | 1000kg |
| Control The Power | Single Phase AC220V-50Hz Single Phase + Ground Wire |
| Workpiece Name | Decorative Items |
|---|---|
| Maximum Workpiece Size Can Be Used | L1500*W200*H200mm Maximum Product Size |
| Pre-oil Removal | 1.5min |
| Hanging Fixture Spacing | 150mm |
| Control The Power | Single Phase AC220V-50Hz Single Phase + Ground Wire |
| Applications | Pre-treatment Before Powder Spraying |
|---|---|
| Conveyor Speed | 2-8m/min |
| Spray Pressur | 80bar |
| Power Supply | 380±10%/50HZ |
| Dryer Temperature | 65℃ |
| Applications | Precision Engineering Industries |
|---|---|
| Tank | 5 Tanks |
| Compressed Air Supply Requirements | 5kg Pressure 10L/min |
| Power Supply | 380±10%/50HZ |
| Ultrasonic Frequency | 28-40 KHZ |
| Applications | Small Metal Parts |
|---|---|
| Total Ultrasonic Power | 3KW |
| Equipment Capacity | 3-5 Minutes / Basket |
| Power Supply | 380±10%/50HZ |
| Heating Temperature | 60℃ |
| Applications | Special Product |
|---|---|
| Conveyor Speed | 1-5m/min |
| Cleaning Pressure | 0.6Mpa |
| Power Supply | 380±10%/50HZ |
| Rinsing Pressure | 0.3Mpa |
| Applications | Castings |
|---|---|
| Conveyor Speed | 1-5m/min |
| Cleaning Pressure | 0.6Mpa |
| Power Supply | 380±10%/50HZ |
| Rinsing Pressure | 0.3Mpa |