Durable - Finish Automated Powder Coating Line for Agricultural Machinery
Automated Powder Coating Line Overview:
Agricultural machinery needs a durable coating to withstand harsh working conditions, and our Durable - Finish Automated Powder Coating Line delivers. The powder used has excellent wear and corrosion resistance. The line's structure is robust, capable of handling large and heavy agricultural machinery parts. It's used to coat tractors, plows, etc., ensuring long - term protection and functionality in agricultural environments.
Partial parameter description of Automated Powder Coating Line
Powder supply center configuration:
1 set of powder supply center body, production material: T2.5mm double-sided spray plastic steel plate;
1 powder conveying system:
The powder recovered through the fluidized tank and large cyclone separator is sent to the vibrating screen and then back to the powder supply bucket.
1 PP powder supply tank
1 vibrating screen, vibrating screen model: TG-19, equipped with a 60 mesh screen.
One set of rotary shaft powder pump, suction pipe, integrated rotating device.
28 stainless steel powder suction tubes.
Recycling powder: VSE450,2.5 kg/min
Standard sieve: 350 microns, 2 sets
Process flow of Automated Powder Coating Line:
Loading⇒ Spray pre-degreasing and residue removal⇒main degreasing by swimming + ultrasonic + heating cleaning ⇒ Spray water washing (I) ⇒ Spray water washing (II) ⇒ Activation by swimming ⇒ spray washing (3) ⇒ spray washing (4), swim lay type passivation, spray washing (5) ⇒ spray washing (6) ⇒ pure water cleaning + adjustable automatic blow water, drop of water, dehydration drying furnace, natural cooling, online roast ⇒ under a belt anti-pull installation baked ⇒ on a PP board make automatic coating powder spraying cabinet⇒ hurricane recovery Powder supply center ⇒ Secondary recovery system ⇒ Grinding cabinet ⇒ Curing oven drying ⇒ Natural cooling⇒ QC inspection ⇒ Unloading ⇒ Packaging
Time of each pretreatment process of Automated Powder Coating Line:
project |
Spray pre-oil removal |
Swimming type main oil removal |
Spray washing 1 |
Spray washing 2 |
time |
1.5min |
4-5min |
1.5min |
1.5min |
project |
The swimming style main activated |
Spray washing 3 |
Spray washing 4 |
Swimming type passivation |
time |
4-5min |
1.5min |
1.5min |
4-5min |
project |
Spray washing 5 |
Spray washing 6 |
Pure water wash |
|
time |
1.5min |
1.5min |
1.5min |
|
Our typical customers:
On the basis of meeting all technical requirements of customer, reduce investment as far as possible, and reduce production energy consumption of the production line as far as possible, so as to reduce production cost;