High Throughput Automated Powder Coating Line For Mass Automatic Powder Coating Machine

1 set
MOQ
$50000-100000/Set
Price
High Throughput Automated Powder Coating Line For Mass Automatic Powder Coating Machine
Features Gallery Product Description Chat Now
Features
Specifications
Workpiece Name: Aerospace Components
Maximum Workpiece Size Can Be Used: L1300*W1100*H1300mm Maximum Product Size
Heating Time: 0~15min
Hanging Fixture Spacing: 150mm
Control The Power: Single Phase AC220V-50Hz Single Phase + Ground Wire
Drive Power: Three-phase AC380V-50Hz Three-phase Five-wire System
Highlight:

High Throughput Automated Powder Coating Line

,

Mass Automated Powder Coating Line

,

Mass Automatic Powder Coating Machine

Basic Infomation
Place of Origin: Dongguan
Brand Name: Hongshun
Certification: CCC/CE
Model Number: HS-MP360CPP
Payment & Shipping Terms
Packaging Details: film
Delivery Time: 50 days
Payment Terms: L/C,T/T
Supply Ability: 5 sets/month
Product Description

Automated Powder Coating Line with Advanced Pretreatment for Aerospace Components

 

Automated Powder Coating Line Overview:

For mass - produced goods, our High - Throughput Automated Powder Coating Line is the answer. It has a continuous conveyor system that can handle a large volume of products simultaneously. The powder application and curing processes are optimized for speed without sacrificing quality. Structurally, it's designed for maximum efficiency. This line is ideal for coating items like consumer electronics in large quantities, increasing production output.

 

Partial parameter description of Automated Powder Coating Line

There are 2 sets of drying furnace burner and heating system

500,000-calorific gas burners

Temperature: adjustable from room temperature to-250

The heating system is placed at the bottom of the curing furnace

Combustion chamber size: L2200mm*W1200mm*H1200mm

Combustion chamber: the furnace plate is made of folded plate, with a thickness of 100mm and a density of 120K sisal rock wool and aluminum silicate wool. The makeup plate and the room body are all screw structure, easy to disassemble and install, and beautiful appearance;

Combustion chamber panel: SUS304#1.5T Stainless steel plate seamless welding structure, durable to prevent deformation at high temperature;

Combustion chamber edge plate: 1.5t galvanized plate reinforced bending treatment, seamless welding

The exterior of the combustion chamber is treated with powder spraying and curing

The whole inner tank is made of seamless welding to form a heat conversion chamber, which is strong and durable.

The combustion chamber set maintenance and cleaning ports with a size of 450*450mm

Curing furnace fan: oil-cooled insulation centrifugal air supply fan with power of 5.5KW and air volume of 4800m3.

 

Gas burner

Model specification: 500,000 kcal burner + combustion chamber hot air circulation system *1 set;

Burner: 1 set of 500,000 kcal stainless steel gas burner *

The size and fire can be adjusted and controlled.

 

Control system: Use the master control system.

Heating time: ±15min

The quality of the burner is guaranteed for one year

The sound and light alarm indicator lights of the burner, fan and other devices are easy to understand and operate

 

Process flow of Automated Powder Coating Line:

Loading⇒ Spray pre-degreasing and residue removal⇒main degreasing by swimming + ultrasonic + heating cleaning ⇒ Spray water washing (I) ⇒ Spray water washing (II) ⇒ Activation by swimming ⇒ spray washing (3) ⇒ spray washing (4), swim lay type passivation, spray washing (5) ⇒ spray washing (6) ⇒ pure water cleaning + adjustable automatic blow water, drop of water, dehydration drying furnace, natural cooling, online roast ⇒ under a belt anti-pull installation baked ⇒ on a PP board make automatic coating powder spraying cabinet⇒ hurricane recovery Powder supply center ⇒ Secondary recovery system ⇒ Grinding cabinet ⇒ Curing oven drying ⇒ Natural cooling⇒ QC inspection ⇒ Unloading ⇒ Packaging

 

Time of each pretreatment process of Automated Powder Coating Line:

 project

Spray pre-oil removal

Swimming type main oil removal

Spray washing 1

Spray washing 2

 time

1.5min

4-5min

1.5min

1.5min

 project

The swimming style main activated

Spray washing 3

Spray washing 4

Swimming type passivation

 time

4-5min

1.5min

1.5min

4-5min

 project

Spray washing 5

Spray washing 6

Pure water wash

 

 time

1.5min

1.5min

1.5min

 

 

 

Our typical customers:

High Throughput Automated Powder Coating Line For Mass Automatic Powder Coating Machine 0High Throughput Automated Powder Coating Line For Mass Automatic Powder Coating Machine 1High Throughput Automated Powder Coating Line For Mass Automatic Powder Coating Machine 2

 

   

 In the production line, self-made equipment should adopt general parts and standard parts in the structural design as far as possible to improve the degree of automation, and fully consider the improvement of production working environment and labor health conditions, and implement the relevant national and industrial standards and safety measures;

Recommended Products
Get in touch with us
Contact Person : Jesse Tang
Tel : 8613929185382
Fax : 86--13929185382
Characters Remaining(20/3000)