Agricultural Machinery Automated Powder Coating Line
Automated Powder Coating Line Overview:
Process flow of Automated Powder Coating Line For Reference:
Loading⇒ Spray pre-degreasing and residue removal⇒main degreasing by swimming + ultrasonic + heating cleaning ⇒ Spray water washing (I) ⇒ Spray water washing (II) ⇒ Activation by swimming ⇒ spray washing (3) ⇒ spray washing (4), swim lay type passivation, spray washing (5) ⇒ spray washing (6) ⇒ pure water cleaning + adjustable automatic blow water, drop of water, dehydration drying furnace, natural cooling, online roast ⇒ under a belt anti-pull installation baked ⇒ on a PP board make automatic coating powder spraying cabinet⇒ hurricane recovery Powder supply center ⇒ Secondary recovery system ⇒ Grinding cabinet ⇒ Curing oven drying ⇒ Natural cooling⇒ QC inspection ⇒ Unloading ⇒ Packaging
Time of each pretreatment process of Automated Powder Coating Line:
project |
Spray pre-oil removal |
Swimming type main oil removal |
Spray washing 1 |
Spray washing 2 |
time |
1.5min |
4-5min |
1.5min |
1.5min |
project |
The swimming style main activated |
Spray washing 3 |
Spray washing 4 |
Swimming type passivation |
time |
4-5min |
1.5min |
1.5min |
4-5min |
project |
Spray washing 5 |
Spray washing 6 |
Pure water wash |
|
time |
1.5min |
1.5min |
1.5min |
|
Our typical customers:
To meet your company's technical requirements while addressing the diverse and comprehensive needs of the coating industry, our design integrates technologies from multiple leading domestic spray painting manufacturers. The system incorporates versatile equipment configurations and operational efficiency considerations, featuring fully automated material handling and intelligent control systems. These innovations streamline maintenance and management processes, reduce labor requirements, expand workspace capacity, enhance production productivity, and minimize potential workpiece damage during processing.